Lots of progress on the pond this week; we got the initial designs done, the hole was shaped up, and the liner was installed. Of course, the install is only on the lower end of the pond because the truck still needs to be able to bring the boat in. Unfortunately that got delayed from Friday to next Friday. In the meanwhile, I’m going to have the landscaper work on building a dry-stack rock wall along the terraced-earth berm. I think this will tie the pond in with the other rock wall terrace across the drive.
Here are some photos of the plans, complete with a scale drawing of the boat in the pond.
And here’s the play-by-by.
Tuesday:
Wednesday:
Thursday: